Our company undertook the study, supply, and installation of over 100 Pollution Control Units (PCUs) on Egnatia Odos. These units filter rainwater from the motorway, retaining oils and fuels, thereby protecting both groundwater and surface water. Certified hydrocarbon separators in accordance with European standard EN 858 were used for the project, providing a reliable, long-term solution with low maintenance requirements.